Available Power Solutions

Siemens SGT 600

25 MW Core Engine, 60 Hz - Brand New

Caterpillar 3516B

2000 KVA Diesel Generator - 80 Units Available

GE LM2500

Gas Turbine - 50/60 Hz, Overhauled

Siemens SGT5-2000E

670 MW Combined Cycle Plant - ZERO Hours

Siemens SGT5-PAC 4000F

298 MW Gas Turbine Plant - Brand New in Crate

Perkins PE-2250 CS

Diesel Generator - 3 Units, Brand New 2023

Siemens V84.3A2

160 MW Gas Turbine - Complete Power Plant

GE TM2500

2x Mobile Gas Turbine - 53 MW Total, Trailer-Mounted

Solar Mars 100

2x Gas Turbine Generator Sets - 11.35 MW each, USA

Siemens SGT 600 Gas Turbine

Gas Turbine Engine

Siemens SGT 600 Core Engine, 60 Hz

New, unused, immediately available

Offer Overview

Exclusive opportunity to acquire a brand new Siemens SGT 600 Core Engine at a significantly reduced price compared to OEM replacement costs.

Key Details

Price: On Request
Contact us for detailed pricing information
OEM lead time: 18 to 24 months (50% down payment)
Our availability: Immediately
Available units: 1 unit offered (buyer receives priority for 3 additional units)
Preservation: Engine stored in nitrogen preservation containers
Mechanical drives: Stored in separate dedicated containers
Transaction: Processed via Swiss escrow for buyer protection and compliance
Technical Highlights
Model Siemens SGT 600 Core Engine
Rated Output 25 MW shaft ISO, 45 MW heat
Exhaust Gas Flow 80 kg/s at 540°C
Ambient Range -15°C to +42°C
Combustion System Dry Low Emission (DLE)
Seismic Zone UBC Zone 4
Area Classification Offshore Zone 1 IIB T3, also suitable for Zone 2
Scope of Supply & Technical Specifications
Application

Spare Core

Rated Output
  • 25 MW shaft output, ISO, 15°C, sea level, no inlet or exhaust pressure losses, 60% relative humidity
  • 45 MW heat output, depending on ambient conditions
Design Conditions
  • Exhaust gas flow: 80 kg/s at 540°C
  • Ambient temperature range: -15°C to +42°C
  • Seismic zone: UBC Zone 4
Area Classification
  • Electrical material designed for Offshore Zone 1 IIB T3 in normal operation
  • Electrical equipment that remains energized after loss of enclosure ventilation remains suitable for Zone 1
Combustion System

Dry Low Emission (DLE) technology

Request Detailed Information

Key Advantages

  • 31% cost savings vs OEM price
  • Immediate delivery vs 18-24 months wait
  • Brand new Siemens equipment
  • Nitrogen preserved for optimal storage
  • Swiss escrow transaction security
  • Priority access to 3 additional units
  • DLE technology for low emissions
  • Offshore rated Zone 1 IIB T3
Caterpillar 3516B Generator
Caterpillar Generator Detail
Caterpillar Generator Side View
Caterpillar Generator Control Panel

Caterpillar Diesel Generator

Caterpillar 3516B 2000KVA 50Hz

Year: 2018, Low Operating Hours

Offer Overview

High-quality Caterpillar diesel generators available in bulk quantities. Well-maintained units with low operating hours, perfect for industrial and commercial power generation needs.

Key Details

Price: On Request
Contact us for detailed pricing information
Total available: 80 units
Minimum order quantity: 10 units
Manufacturing year: 2018
Operating hours: 369 Hrs ~ 1,899 Hrs
Manufacturer: Caterpillar
Technical Specifications
Engine Model CAT 3516B
Rated Output 2000 KVA
Voltage 400 Volt
Phase Configuration 3 Phase 4 Wire
Frequency 50 Hz
Speed 1500 RPM
Year 2018
Operating Hours 369 Hrs ~ 1,899 Hrs

Detailed specification sheets available upon request

Request Detailed Information

Key Advantages

  • Low operating hours - well maintained units
  • Bulk availability - 80 units total
  • Premium brand - Caterpillar quality
  • Recent year - 2018 manufacturing
  • High capacity - 2000 KVA output
  • Standard specs - 400V, 50Hz, 3-phase
  • FOB Japan - efficient logistics
  • Flexible quantity - min. 10 units
GE LM2500 Gas Turbine

GE LM2500 Gas Turbine

25 MW Gas Turbine - Frequency Switchable

Year: 1999, Overhauled, Excellent Condition

Offer Overview

GE LM2500 Gas Turbines available in excellent condition. Frequency-switchable (50/60 Hz), overhauled with low post-overhaul running hours. Actual delivery time for new turbines is more than 3 years - these are available now with flexible delivery options.

Key Details

Price: On Request
Contact us for detailed pricing information
Model: GE LM2500
Serial Numbers: 565-103 & 565-104
Rated Output: 25 MW each
Frequency: Switchable 50/60 Hz
Overhaul Status: Overhauled
Hours before overhaul: ~18,000 hours
Hours after overhaul: ~1,000 hours
Location: Asia
Manufacturing Year: 1999
Sales Options
Option 1: Core Engines Only
  • Includes turbines as inspected
  • Shipping Time: ~2–3 weeks
Option 2: Complete Package
  • Includes turbines + brand new alternator, gearbox, and control panel
  • Delivery Time: ~6 months
Inspection Summary (November 2025)

Report No.: 114064
Issued by: Taiwan Power Company, Department of Power Equipment Repair and Maintenance
Inspection Date: November 10, 2025
Method: Visual Examination (borescope) using Olympus iPLEX NX Ø6 mm × 5 m

Scope of Inspection
  • Compressor Section: Stages 0–2, 11–12
  • Combustor (including fuel nozzles)
  • High-Pressure Turbine (HPT) Section
  • Power Turbine – 1st Stage Nozzles
Results

Engine Serial No. 565-103:
✓ Compressor section: No abnormalities
✓ Combustor (incl. nozzles): No abnormalities
✓ HPT section & Power turbine 1st stage nozzle: No abnormalities

Engine Serial No. 565-104:
✓ Compressor section: No abnormalities
✓ Combustor (incl. nozzles): No abnormalities
✓ HPT section & Power turbine 1st stage nozzle: No abnormalities

Final Judgement: Both turbines "No reportable indications" (defect-free)

Request Detailed Information

Key Advantages

  • Immediate availability vs 3+ years wait
  • Frequency switchable - 50/60 Hz
  • Low running hours - ~1,000 hrs after overhaul
  • Excellent condition - borescope verified
  • Official inspection - Nov 2025
  • 2 units available - Serial 565-103 & 565-104
  • Flexible options - core only or complete package
  • Fast delivery - 2-3 weeks (core only)
Siemens SGT5-2000E Gas Turbine
SGT5-2000E Detail View
SGT5-2000E Technical View
SGT5-2000E Cutaway View

Siemens SGT5-2000E Combined Cycle Power Plant

670 MW Complete Power Plant - NEW & UNUSED

Year: 2012, ZERO Operating Hours

Offer Overview

Complete 670 MW Combined Cycle Power Plant with 3 Siemens SGT5-2000E Gas Turbines, Steam Turbines, and all accessories. Brand new, unused with ZERO operating hours. Highly suitable for Data Center applications. Optional 60Hz conversion available.

Key Details

Price: On Request
Contact us for detailed pricing information
Total Capacity: 670 MW (3 modules x 223.3 MW)
Configuration: Combined Cycle (Gas + Steam)
Gas Turbines: 3x Siemens SGT5-2000E (166 MW each)
Steam Turbines: 3x Siemens (57.3 MW each)
Voltage: 10.5 kV, Frequency: 50 Hz
Manufacturing Year: 2012
Total Firing Hours: ZERO
Fuel: Natural Gas
Technology: Dry Low NOx
Location: China
Condition: Some components still in original crates
Complete Scope of Supply
Gas Turbine Systems
  • 3x SGT5-2000E Turbines
  • 3x Alternators
  • All turbine accessories
Steam Systems
  • 3x Steam Turbines
  • 3x Steam Alternators
  • 3x HRSG Sets
  • Steam Tank
Auxiliaries
  • Cooler & Lube Systems
  • Gas Treatment Plant
  • Water Treatment Plant
  • Chimney Units
Electrical Systems
  • Transformer Sets
  • Central Control Unit
  • HV & LV Cabinets
  • MCC & HV Complete Art
Safety Systems
  • Fire Fighter Units
60Hz Conversion Option

With factory assistance, we provide conversion from 50 Hz to 60 Hz operation. The major items will be shipped immediately, and the speed increaser & generator will be delivered well before installation is completed.

Conversion Includes:
  • 3x Step-up Gearboxes (180MW power, 1:1.2 ratio)
  • Input speed: 3000 rpm → Output speed: 3600 rpm
  • 3x Matching 200MVA Generators (60Hz × 3600 rpm)
  • All new equipment with 12-month minimum manufacturer's warranty
  • Frequency converters for all existing switchgear to ensure 60Hz operation throughout
Commercial Offer for 60Hz Conversion:

Price: On Request
Contact us for detailed quotation including gearboxes, generators and consultancy fees

Request Detailed Information

Key Advantages

  • ZERO operating hours - brand new, unused
  • Complete turnkey plant - 670 MW total capacity
  • Siemens E-class technology - 30+ years proven track record
  • Data center ready - highly suitable for large data centers
  • Modular design - easy transport & installation
  • 60Hz conversion available - factory-supported upgrade
  • Complete documentation - full inspection available
  • Original packaging - some components still in crates
Siemens SGT5-PAC 4000F Gas Turbine
SGT5-PAC 4000F Crated Component
SGT5-PAC 4000F Installation View
SGT5-PAC 4000F Detail View

Siemens SGT5-PAC 4000F Gas Turbine Plant

298 MW Power Plant - NEW & UNUSED

Year: 2016, Original Packaging (In Crate)

Offer Overview

Complete 298 MW Gas Turbine Plant with Siemens SGT5-PAC 4000F. Brand new, unused, original packaging. Operates on natural gas (primary) and heating oil (secondary fuel). Located in EU with inspection available. Optional assembly/erection service under Siemens supervision with extended warranty.

Key Details

Capacity: 298 MW, 50 Hz
Condition: New, unused, original packaging (in crate)
Year: 2016
Fuel: Natural gas (primary), Heating oil (secondary)
Quantity: Only ONE (1) unit available
Location: European Union
Status: Perfect condition, all components in original packaging
Frequency Conversion Option (50Hz → 60Hz)

50Hz to 60Hz conversion possible against additional cost (estimated EUR 10-15 million, exact price TBD).

Important: Seller prefers to sell in current 50Hz configuration and does not wish to perform the conversion. Conversion would be buyer's responsibility if required.

Optional Assembly & Extended Warranty

Professional Assembly Service Available: Upon buyer request, we can arrange assembly/erection at end customer location under supervision of Siemens engineers.

  • Installation supervised by Siemens engineers
  • Extended warranty from Siemens granted
  • Additional costs apply for this service
Business Terms & Timeline
Down Payment:
20% of total price, due on the day of mandatory SGS visual inspection.
Contract & Invoice:
Will be prepared before inspection visit.
Balance Payment:
Due within 4-6 weeks after 20% down payment. Plant can only leave warehouse after full payment.
Transport Preparation:
After full payment, 1-2 months preparation time for transport to end customer. Storage duration can be extended if needed by arrangement.
Inspection Details:

Inspection: Available at earliest convenient date. Passports of inspection participants required in advance.
Inspection Fee: EUR 55,000 to cover travel and personnel costs.
Fee Waiver: Can be waived if buyer provides proof of capital (PoF) and formal letter of intent (LoI) with serious interest. This condition serves efficient and transparent processing for all parties. Nobody wants to waste time.

Significant Interest:

Two additional interested parties from the USA. Swift decision recommended.

Request Detailed Information

Key Advantages

  • Brand new, unused - original packaging (in crate)
  • 298 MW capacity - Siemens SGT5-PAC 4000F technology
  • Dual fuel capability - natural gas & heating oil
  • EU location - ready for inspection
  • 60Hz conversion available - optional upgrade path
  • Professional installation - Siemens-supervised assembly optional
  • Extended warranty - available with Siemens installation service
  • Exclusive opportunity - only 1 unit available
  • Act now - deadline Jan 20, 2026, US competitors interested
Perkins PE-2250 CS Generator
Perkins Generator Detail
Perkins Generator Side View
Perkins Generator Container

Perkins Diesel Generator

Perkins PE-2250 CS, 50 Hz

Year: 2023, Brand New - Never Used

Offer Overview

Brand new Perkins diesel generators with complete high sound insulation container solution. Originally planned for a poultry farm project that was not implemented. Exceptional opportunity for immediate deployment.

Key Details

Price: On Request
Contact us for detailed pricing information
Total available: 3 units
Stock number: 25080-27
Year of manufacture: 2023
Operating hours: Only 2 Hours
Condition: Brand New - Never Used
Technical Specifications
Genset Type PE-2250 CS
Engine Type Perkins 4016-61 TRG2
LTP Rating 2,250 kVA / 1,900 kW
PRP Rating 2,000 kVA / 1,600 kW
Alternator Stamford HVSI804R
Voltage 10 kV
Frequency 50 Hz
Speed 1,500 rpm
Cooling Water with radiator
Electric Start 24 V
Control Panel Easygen 3500 XT
Fuel Tank Approx. 2,000 liters

Complete documentation and certificates available

Container Equipment
  • Container with high sound insulation
  • Inlet and exhaust air silencers and blinds
  • Exhaust system with silencer
  • Collecting tank for liquids in container bottom
  • 10/0.4 kV transformers available on request
Commercial Terms
Payment: 20% down payment with order, 80% before delivery
Delivery time: As agreed, subject to prior sale
Warranty: Without warranty (brand new condition)

Key Advantages

  • Brand new - never used, only 2 operating hours
  • Complete solution - turnkey containerized system
  • High performance - 2,250 kVA LTP / 2,000 kVA PRP
  • Sound insulated - suitable for residential areas
  • Immediate availability - 3 units in stock
  • EU location - Germany, ready for inspection

Additional Views

Additional View 1
Additional View 2
Additional View 3
Siemens V94.2 Gas Turbine
Turbine Detail
Turbine Components
Control System

Siemens Gas Turbine Power Plant

Siemens V94.2 (SGT5-2000E) - 160MW

Year: 2004 | Operational: 2006-2026 | 50Hz

Offer Overview

Complete 160MW gas turbine power plant with excellent maintenance history. Currently operational with scheduled stop in March 2026. German engineering quality from Siemens AG with full documentation available.

Key Details

Price: On Request
Contact us for detailed pricing information
Running hours: 35,020 hours (as of Oct. 2025)
Number of starts: 1,522 times
Last maintenance: October 2023
Full maintenance: February 2016
Scheduled stop date: March 31, 2026
Technical Specifications
Manufacturer Siemens AG Power Generation (Germany)
Model V94.2 (SGT5-2000E)
Manufacturing Year 2004
Start Year 2006
Power Output 160 MW
Speed 3,000 rpm (50Hz)
Air Inlet Condition 5°C, 1013 hPa
Pressure Ratio 12:1
Max. Work Pressure 11.5 bar / 265°C
Max. Operation Temp. 360°C / 9.3 bar
Turbine Size (L×W×H) 10m × 12m × 7.5m
Turbine Weight Approx. 235 tons

Complete maintenance records and operation logs available

Turbine Features
  • 16 compressor stages for optimal air compression
  • 4 turbine stages for efficient power generation
  • Two bearings for stable operation
  • Two vertical combustion chambers with 8 burners each (16 burners total)
  • Air-based system - air as operating fluid compressed by 16-stage compressor
  • Fuel flexibility - fuel added to hot air and ignited in combustion chambers
Commercial Information
Availability: Available after scheduled shutdown on March 31, 2026
Documentation: Complete maintenance records, operation logs, and technical documentation available
Price: Available on request - contact us for detailed quotation

Key Advantages

  • Proven technology - Siemens German engineering quality
  • Well maintained - complete maintenance history since 2006
  • 160MW capacity - suitable for large-scale power generation
  • 50Hz operation - ideal for European and Asian markets
  • Recent maintenance - last serviced in October 2023
  • Complete power plant - ready for relocation and reinstallation
GE TM2500 Gas Turbine
GE TM2500 Detail View

GE TM2500 Gas Turbine Generator

2 x TM2500 Units - Trailer-Mounted Mobile Power

Fast-Track Mobile Power Solution

Offer Overview

Two GE TM2500 trailer-mounted gas turbine generator sets offering rapid deployment mobile power generation. Industry-proven technology with exceptional reliability for emergency power, peak shaving, or temporary power needs. Fully containerized and road-transportable solution.

Key Details

Output per unit: ~26.6 MW (ISO base load)
Total capacity: ~53 MW (2 units)
Fuel: Natural Gas / Liquid Fuel capable
Technology: Dry Low NOx (DLN)
Configuration: Trailer-mounted, fully containerized
Mobility: Road transportable
Available units: 2 complete sets
Availability: Subject to confirmation
Technical Specifications
Model GE TM2500 Gen 8
Power Output (ISO) ~26.6 MW per unit (base load)
Frequency 50/60 Hz (switchable)
Voltage 11 kV (standard configuration)
Efficiency ~39% (simple cycle)
Heat Rate ~9,200 kJ/kWh (HHV)
Exhaust Temperature ~538°C
Exhaust Flow ~100 kg/s
Start-up Time ~10 minutes to full load
Emissions DLN combustion: <25 ppm NOx (dry, 15% O₂)
Package Configuration & Features
Complete Package Includes:
  • Gas Turbine Generator (LM2500 aero-derivative core)
  • Inlet and exhaust systems with silencing
  • Fuel gas system and controls
  • Lube oil system
  • Fire protection system
  • Control and instrumentation systems
  • Electrical switchgear and protection
  • Trailer-mounted ISO container enclosure
Key Features:
  • Rapid Deployment: Factory-assembled and tested, quick site installation
  • Mobile Solution: Road-transportable for temporary or relocatable applications
  • Dual Fuel Capability: Natural gas primary, liquid fuel backup
  • Fast Start: 10-minute start-up time for emergency response
  • Proven Reliability: Aviation-derived LM2500 core with >100 million operating hours
  • Low Emissions: DLN technology for environmental compliance
  • Compact Footprint: Small site requirements compared to conventional power plants
Applications & Use Cases
Emergency Power

Rapid response to power outages and grid failures

Peak Shaving

Reduce demand charges during peak periods

Temporary Power

Construction sites, events, maintenance shutdowns

Grid Support

Supplemental capacity and frequency regulation

Remote Locations

Mining, oil & gas, island utilities

Industrial Sites

Manufacturing facilities, data centers

Request Detailed Information

Key Advantages

  • Rapid deployment - 10 min to full load
  • Mobile power - trailer-mounted & road-transportable
  • Proven technology - aviation-derived LM2500 core
  • Dual fuel - natural gas & liquid fuel capable
  • High efficiency - ~39% simple cycle
  • Low emissions - DLN technology <25 ppm NOx
  • Compact footprint - minimal site requirements
  • Quick installation - factory-assembled & tested
  • Flexible frequency - 50/60 Hz switchable
  • Two units available - scalable to ~53 MW total
Solar Mars 100 Gas Turbine

Image Gallery

Solar Mars 100 - Image 1
Solar Mars 100 - Image 2
Solar Mars 100 - Image 3
Solar Mars 100 - Image 4
Solar Mars 100 - Image 5
Solar Mars 100 - Image 6
Solar Mars 100 - Image 7
Solar Mars 100 - Image 8
Solar Mars 100 - Image 9
Solar Mars 100 - Image 10
Solar Mars 100 - Image 11

Solar Mars 100

Gas Turbine Generator Set

2 units available - Currently located in USA

Availability Options

  • Option 1: Zero-hours refurbished - Delivery in approximately 1 month FOB USA
  • Option 2: As decommissioned (with hours) - Immediate delivery FOB USA
  • Inspection visit available January/February 2026
  • Complete overhaul/refurbishment can be initiated immediately upon request

Key Features

11.35 MW Output Power
USA Location
2 Units Available
Inspection Available
Technical Specifications & Performance Data

Performance Characteristics

Output Power 11,350 kWe (11.35 MW)
Heat Rate 10,935 kJ/kWe-hr (10,365 Btu/kWe-hr)
Exhaust Flow 153,245 kg/hr (337,836 lb/hr)
Exhaust Temperature 486°C (902°F)

Application Performance

Steam (Unfired) 23.7 tonnes/hr (52,340 lb/hr)
Steam (Fired) at 1538°C (2800°F) 113.2 tonnes/hr (250,830 lb/hr)
Chilling (Absorption) 20,490 kW (5820 refrigeration tons)

Dimensions & Requirements

  • Package height: 3.8 m (12'5")
  • Package weight: 83,148 kg (181,000 lb)
  • Enclosure length: 14.2 m (46'5")
  • Generator maintenance space: 2.7 m (9'2")
  • Minimum clearance required for engine removal: 3.0 m (10'0")
  • Minimum clearance for routine operation and maintenance: 5.4 m (20'11")

Ideal Applications

Industrial Power Generation Reliable base load and peaking power
Cogeneration (CHP) Combined heat and power applications
Oil & Gas Operations Offshore and onshore power solutions
Process Industries Steam and power for industrial processes

Inspection & Documentation Available: Complete borescope inspection photos and decommissioning documentation provided upon request. Contact us for detailed technical specifications and to schedule an inspection visit in January/February 2026.

Interested in These Exclusive Offers?

Contact us for detailed information on specifications, documentation and transaction process.

Request Information